#ExploreKhonKaen ๐จ๐ฝ๐ฑ๐ฎ๐๐ฒ! ๐ฃ๐ฟ๐ผ๐ด๐ฟ๐ฒ๐๐ ๐ผ๐ป ๐๐ต๐ฒ ๐ฐ๐ผ๐ป๐๐๐ฟ๐๐ฐ๐๐ถ๐ผ๐ป ๐ฝ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐ ๐๐ผ ๐ฒ๐
๐ฝ๐ฎ๐ป๐ฑ ๐ฎ๐ป๐ฑ ๐๐๐ฟ๐ฒ๐ป๐ด๐๐ต๐ฒ๐ป ๐๐ต๐ฒ ๐ผ๐ฟ๐ถ๐ด๐ถ๐ป๐ฎ๐น ๐ฎ๐ฝ๐ฟ๐ผ๐ป.
After construction began on January 25, 2024, the jet bridge was closed and temporarily replaced by bus gates. It is expected to be completed and ready for normal service this year. Capable of accommodating 6โ12 180-seat B737-800 aircraft.
In addition, work is being done to improve and strengthen the original runway. Construction of one new driveway and dredging of water storage ponds. Improve the drainage system. Construction of a new internal patrol road. Construction of a fire station and an electrical system control facility.